How long it takes to build a website depends mostly on two things: how big the site is, and how quickly the content and feedback come in. A one-page Starter website can be live in about a week once your content arrives. A custom website takes longer, because it's designed from scratch and you sign off each stage along the way.

That second part surprises people. In my experience, the design and build are rarely what holds a website up. Waiting for words, photos and decisions is. Here's what the timeline really looks like, and how to keep yours moving.

Website build timelines at a glance

Type of siteTypical timelineWhat sets the pace
Starter (ready-made) websiteAbout a week from receiving your contentHow quickly you send your logo, photos and words
Landing pageQuoted with a timeline up frontCopy, ad creatives and tracking setup
Custom websiteWeeks rather than days, with a timeline for each stage in your quoteNumber of pages, features, and how quickly each stage is signed off
Bigger builds (bookings, ecommerce, integrations)Quoted to scopeSetup and testing of each extra system

I don't give one number for every project, because a five-page site with a contact form and a site with online bookings and a shop are very different jobs. What you should always get is a clear timeline in writing before work starts.

Why a Starter website is so quick

My ready-made websites start from a finished design I've already built and tested. There's no blank canvas, so most of the design work is already done.

The steps are simple:

  1. Pick the design that suits your business.
  2. Send your logo, photos and the basics about your business.
  3. Tailor: I set it up with your colours, fonts, words and photos, connect your domain and contact form, and send you a preview link.
  4. Launch: one round of tweaks, then your site goes live.

That's usually within a week of receiving your content. The clock starts when your content arrives, not when you first get in touch.

What happens in a custom website build

A custom website takes longer because more is being made just for you. My process has four stages, and each one has its own step on the timeline:

  1. Discuss. A free call about your business, your customers and your budget.
  2. Develop. We agree the pages and features, build a moodboard together, and you get a written scope, a fixed quote and a timeline for each stage.
  3. Design. I design two homepage directions as clickable prototypes. You choose one, we refine it, then I design the rest of your key pages to match.
  4. Deliver. I build the site, set up the search basics, and test it on phones, tablets and browsers. After your final review, we launch.

Each stage needs your sign-off before the next one starts. That's deliberate: it means there are no surprises at the end, and nothing gets built that you haven't approved.

See ready-made websites, live in about a week →

What slows a website down

These are the things that most often stretch a timeline, on any project with any designer:

  • Content. Writing the words for every page takes longer than most people expect. It's the single biggest cause of delays.
  • Photos. Waiting on a photoshoot, or hunting through a phone for usable images.
  • Feedback. A week to reply to a design round adds a week to the project.
  • Too many decision makers. If three people need to agree on every change, build that time in.
  • Logins. Not knowing who registered the domain, or where the password lives.
  • Changing the scope mid-way. Adding online bookings or a shop halfway through means extra design, setup and testing.

How to get your website live sooner

You have more control over the timeline than you might think.

  • Start writing your content early, or ask your designer to write it for you
  • Gather your logo files and your best photos in one folder
  • Find your domain login and any Google account details
  • Choose one person to give feedback and sign off
  • Block out time to reply to each design round within a couple of days
  • Agree the full scope at the start, so nothing gets added later

I've written a full guide on what to prepare before building a website, with everything to gather before day one.

Is a faster website a worse website?

Not necessarily. It depends on what you need.

If you need a professional site quickly and a proven layout suits your business, a Starter website is quick because the design work is already done, not because corners are cut. It's the same fast, mobile-first build as my custom sites.

If you want something that's unmistakably yours, or you need bookings, ecommerce or a bigger site, a custom build is worth the extra time. And if you're running an ad campaign for one offer, a landing page can get that campaign going without a whole new website.

You can compare all three on my pricing page.

Frequently asked questions

How long does it take to build a small business website?

A one-page Starter website is usually live within about a week of receiving your content. A custom website takes longer, and you'll get a timeline for each stage in your quote.

What's the most common reason a website is delayed?

Content. Writing the words for every page, and gathering photos, takes longer than most people expect. Having them ready before the build starts is the best way to stay on track.

Can you build a website in a week?

Yes, for a one-page Starter website, once I have your logo, photos and words. A custom site with several pages, a blog and integrations can't responsibly be designed, built and tested in a week.

Does a faster website cost less?

Often, yes, because less design work is involved. A Starter website is $1,000 + GST and a custom website starts from $3,500 + GST. The full breakdown is on my pricing page.

Do I need to be available during the build?

A little. You'll need to share content, give feedback on designs and sign off each stage. Quick replies make the biggest difference to how fast your site goes live.

The bottom line

A Starter website can be live in about a week, and a custom site takes longer because it's built around you, stage by stage. Either way, the best thing you can do for your timeline is have your content ready and reply quickly. If you're weighing up time against budget, my guide to how much a website costs in Australia covers the other half of the decision.

Get my free website plan →Personal reply within 24 hours, always from me.

Written by

Chloe, Coco Creatives. Sunshine Coast web designer with 8 years in web design and branding. I design and build every site myself, from our first chat through to handover.